6/20/19

The list

Starting to complete the last items:

New:
- Finish the paper work
- Paint the last three letters of the registration marks (the vinyl came loose)
- Solve the right stick trim down button not working (Once I got the trim wiring figured out I found this new issue)

Done:
- Finish the paper work (Probably)
- Paint the last three letters of the registration marks (the vinyl came loose)
- Wire the elevator trim correctly
- make the flap switch move the flaps in the right direction
- Rewire the magnetometer
- Re-calibrate the magnetometer
- Validate all G3X green/yellow/red band settings

Remaining:
- Solve the right stick trim down button not working
- Connect the landing light
- Get the transponder working (Filled out the warranty claim today)
- Verify/redo fuel tank sender calibration (would have been done today but it kept raining)
- Attach the wing walk spacers with the proper hardware (Did most of it today, but I did not have the tools to dimple the three holes you match drill)
- Another engine run with proper EGT/CHT reading, prop cycle and a short full power run. (would have been done today but it kept raining)

Other things to be done soon but not necessary before first flight:
- Install aileron trim
- Install autopilot servos
- Install tablet holder

I sounds like I can expect my temporary permit to fly next week :) That would be amazing!

No comments:

Post a Comment