Another day at the airport.
Got my registration marks painted under the wing, this would have been so much easier to do before the wings was mounted to the airplane!
Getting the washers in place when attaching the elevator controls was difficult, should have done this before mounting the vertical stabilizer. Then the molex connector on the trim wires broke, after reading about others problems with these connectors it was probably for the best that I had to hard wire them instead.
I finished off with testing my nav and strobe lights. All nav lights worked, the strobe worked in the tail and on the left wingtip but not on the right wingtip, to be investigated.
Showing posts with label 36-Control systems. Show all posts
Showing posts with label 36-Control systems. Show all posts
5/25/19
9/26/17
36, lucky
Have read about other builders problem with adjusting the control stops, it being really difficult to reach and file the lower stops.
I was lucky, the travel was within limits without any action and I only had to file the left upper stop for the stops on both sides to reach the stop in both directions at the same time. Took me less than 20 minutes.
I ended the session with dimpling, scuffing, priming and painting the brace brackets and the brace (roll over structure). Ni pics of this action.
I was lucky, the travel was within limits without any action and I only had to file the left upper stop for the stops on both sides to reach the stop in both directions at the same time. Took me less than 20 minutes.
I ended the session with dimpling, scuffing, priming and painting the brace brackets and the brace (roll over structure). Ni pics of this action.
9/25/17
9/24/17
Another productive day
My oldest preferred to stay at home with me and joining me in the garage, rather that going out playing in the forest :) He is getting really useful now, bringing me tools and pieces, saved me from getting out and into the fuselage again, at least twice today.
Today I had the magic touch, when connecting the pushrods to the idler arm, the washers basically fell into place with no more than two tries per washer. Started with section 37, roll over structure as I am waiting for some glue to set before match drilling the control sticks and stick bases.
Today I had the magic touch, when connecting the pushrods to the idler arm, the washers basically fell into place with no more than two tries per washer. Started with section 37, roll over structure as I am waiting for some glue to set before match drilling the control sticks and stick bases.
9/23/17
9/22/17
9/21/17
9/20/17
Section 36
Section 36, Aileron & Elevator systems. Separated some parts, some trimming, scuffing and priming. Then I made templates and drilled #40 pilot holes in the pushrod ends.
Subscribe to:
Posts (Atom)