2/14/16

Low pace

January was slow. like last year plus I kind of lost the drive when I got to the point that continuing with the tanks became impractical without access to proseal.

February started with a one week vacation (Fuerte Ventura) followed by kids with lost sleeping routines :-/ Yesterday was spent in the shop, one hour that I do not count as airplane building and then another with more reorganizing before the next kits arrive. Tomorrow I plan to buy lightning for the shop attic to be able to move more stuff in there and thereby freeing up more space. I am already foreseeing needing to take down the wall in the back of the shop before beeing able to mount the engine mount, probably about a year before that is needed but some preparation might as well be done now.