Jul 2014
Tot 52.6 Tail 51.1 Elevator 35.9 Horizontal spar 15.2 Shop 1.5
Bringing the total numbers up to:
222.5
Tailkit 142.5
Elevator 35.9
horizontal spar 35.8
rudder 33.5
vertical spar 27.6
tail inventory 10
Shop 38.2
Practice kit 5.5
General reading of manuals 5.0
Planning, dreaming, finances 10.0
Paperwork, ordering 20.0
Tonights work will be written in a post tomorrow.
8/2/14
7/31/14
4.4 hours today, lots done on the elevators
7/27/14
Riveting elevator parts
Feels great to start riveting again, the preparing of parts is not close to being as fun as actually putting them together.
Only one rivet that had to be drilled out :D
Only one rivet that had to be drilled out :D
7/26/14
Proseal and the feeling of squeezing 27 perfect rivets...
Proseal and the feeling of squeezing 27 perfect rivets... just to realize that you have forgotten to cleco all parts in place. Good thing that I have gotten great at drilling out rivets ;)
Proseal, what a messy substance!!! Not looking forward to making the fuel tanks!
Proseal, what a messy substance!!! Not looking forward to making the fuel tanks!
![]() |
And about ten seconds later, I realize that the hinge is not in place! |
![]() |
End result is great so only 30min and 27 rivets lost :) |
Elevator trim tab edge riveted
7/23/14
Summer time... less work being done
Grinded the dimple die to be able to dimple the nutplates that I then riveted onto the trim access reinforcement doubler.
7/17/14
7/16/14
Preparing elevator parts
Almost time for priming. Lots of countersinking, dimpling, deburring, edge rolling and scuffing. Cleaned the parts with a solvent, the large parts inside and then the smaller parts outside in the fresh air.
Subscribe to:
Posts (Atom)