The building of a Vans RV-14
4/14/18
Started match drilling the top cowling
After having removed, adjusted, mounted, checked and ... for around 40 times, it was finally good and with about a 4.6 mm gap (it should be 4.8). I called this close enough and started match drilling it to the hinges.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment