Showing posts with label 6-Vertical Stabilizer. Show all posts
Showing posts with label 6-Vertical Stabilizer. Show all posts

2/4/19

Starting from the beginning

First I wired up some switches for the MGL ECB.

Then I started from chapter 6 and verified that all tasks have been done. I am now at chapter 9, so far it has only been some clearly marked "final torque" task to do.

The third picture is just for me as it popped out to me, clearly showing that I have lost 6,6Kg (14.5 pounds) in January by a rather strict LCHF diet. Another month of this and I will be back in reasonable shape again :)





1/22/15

reamed front stabilizer attachment hole

Made the hole into correct size and reassembled. Ended up realizing that it would be much safer to get some help for actually mounting the rudder.

I got some shipping/customs documentation from Vans so I guess the wing kit is close :D









1/21/15

Dismounted vertical stabilizer

About 10 months ago, I forgot to final drill a hole in the VS01401 front spar doubler. This cost me 20 minutes of extra work today and will probably cost me another 20 minutes on the next session.

1/20/15

Nearing the end of chapter 11

I had decided to keep the shop clear awaiting the wing-kit but I needed to work on the kit tonight so I assembled the main pieces:



11/6/14

Match drilled the vertical spar

Went well, then primed the part of the fuselage that will get the top side skin on it.




11/5/14

Vertical stab mounted on rear fuselage

Vert stab mounted on rear fuselage, temporary of course, the next step is some match drilling. Stood there and just looked at it for almost 15min :D

I was able to squeeze almost all rivets on the F-01414 Aft Deck by sometimes assemble the sqeezer dies after having inserted the yoke into the lightening holes.


9/20/14

Finally working on the RV again

Finally got around to making a real shift in the garage. Re did some rivets on the vertical stabilizer that have bugged me for months. Instead of rivets that were barely acceptable, I now have good rivets.








4/24/14

Metal work on the vertical spar done!

Last night I finished the first build chapter in the Tail kit manual :D
0.5 hours was done on the 22nd and then 1.3 yesterday. 0.3 of those were setting up another shelf in the shop.
How to get in there?

Not possible even without the flat set

does this bucking bar fit, no

this one, no?

Created my own bar

does not work!





With it in the vise? yes but not good enough!


Bought some iron plates to be able to do indirect riveting


This will work

flattening a file


success



Other side


The last two ordinary rivets


Enough?

Calculating

A little more




Testing on some trash

Putting in the last three pulled rivets






Away to storage
Until I find a better place
Marking all steps as done

4/22/14

I am no longer afraid

Off the rivet gun.

Last night I did almost all the remaining rivets on the vertical spar with the gun. Only had to drill out two of them. It was difficult to find a way to fit a bucking bar into the space available. Still have two rivets to pound, will read up before doing a session tonight. Yesterday I spend 1+2 hours in the shop.
Pounded enought?


Had to be drilled out, always getting a good centered hole with the Dremmel

And out it goes

These small clamps are great for keeping the skins together


Better mask the ones that should not be riveted

















Almost done!

Need to get in there somehow