The empennage canoe is back up and all fuselage and finish kit parts are stored on shelves and wherever I could find some space. Soon I am out of excuses for not starting to use proseal when completing the wing tanks.
Showing posts with label Inventory. Show all posts
Showing posts with label Inventory. Show all posts
3/28/16
Fuse inventory done
And the results, missing:
| 1 | Bag 2305 0.1 AN426AD3-7 | AN426AD3-7 |
| 1 | K1100-08D | nutplate dimpled |
| 2 | AN316-4R | nut, thin jam 1/4 |
| 1 | AN365-632A | nut.stop 6-32 |
| 3 | K1000-06 | platenut 6-32 |
| 1 | AN526C832R8 | screw, truss hd ss |
| 2 | NAS1149F0432P | washers |
| 5 | K1000-08D | nutplate dimpled |
3/25/16
Finish kit inventory done
Not too bad but several more errors than in the empennage and wing kit:
Missing parts
Missing parts
| 1 | AN6-30 | Bolt |
| 2 | NAS1149F0663P | washer |
| 1 | NAS1149F0363P | washer |
| 1 | WASHER-00007 | ALM.WASHER |
| 1 | AN507C832R0 | SCREW, FLT HD SS |
3/22/16
Inventory continues
14.3 hours done so far. I am almost done with the hardware bags, surprisingly many mistakes found. One wrong bag delivered , luckily the missing bag 2306 contains 426 3-5 rivets that I have plenty of and that would be easy to find locally. (the bag I got but should not, 2006 contains some lock nuts, pull rivets and washers)
3/16/16
Finish kit inventory part 2
Unpacking of the finish kit continues. These are the parts that will wait the longest to be used. The pictures are not that interesting and there is not much to write about this.
You might not read so much on this blog in the near future but I will continue to put 1-2 hours per evening into the project. The wing kit took almost exactly 10 hours to inventory so I probably have close to 16 hours of inventory left with these two kits. I promise to start updating the blog when the inventory is done.
You might not read so much on this blog in the near future but I will continue to put 1-2 hours per evening into the project. The wing kit took almost exactly 10 hours to inventory so I probably have close to 16 hours of inventory left with these two kits. I promise to start updating the blog when the inventory is done.
| Nice motor mount, engine is not decided yet so we will see if I will use this mount |
| The gear legs are massive! |
| 4 bags of paper so far |
| the fuselage box top, was screwed in place, unfortunately the finish kit was nailed, a pain to remove all the sharp nails (the u-type) |
3/15/16
Fuselage and finish kits are here
Some things are back ordered, they have been shipped but not arrived.
Now I have to figure out how to store everything in a way that makes it possible to work again. As it is now, I cannot even empty the boxes :/
Now I have to figure out how to store everything in a way that makes it possible to work again. As it is now, I cannot even empty the boxes :/
2/8/15
Wing inventory done!
And the last 0.1 hours verified that all parts were delivered :D I also moved the large skins into the delivery box that is now standing almost sideways. Not perfect but it will have to do.
Tonight I also acted as an FI. During VFR darkness training my student went into IMC, happy to see him make a good textbook 180. We could not complete the lesson but he learnt a lot more than if the weather had been better.
Tonight I also acted as an FI. During VFR darkness training my student went into IMC, happy to see him make a good textbook 180. We could not complete the lesson but he learnt a lot more than if the weather had been better.
2/7/15
Wing inventory 99% done
Just need to verify two items, I beleive everything was delivered.
I probably need to spend one more hour reorganizing parts and tools before I can actually start building again. Inventory took 4.9 hours in total, some have stated that they did it in three, I cannot imagine that they managed to verify the content of all bags (not rivets) in that time.
I probably need to spend one more hour reorganizing parts and tools before I can actually start building again. Inventory took 4.9 hours in total, some have stated that they did it in three, I cannot imagine that they managed to verify the content of all bags (not rivets) in that time.
2/4/15
1/29/15
Wing inventory started
Had to work tonight so only managed a short session, started unpacking and also sealed of the garage doors with parts from the empennage shipping crate and the top from this one.
3/1/14
Status 2014-03-01, inventory done!
Inventory done!
Spent about an hour yesterday and some hours tonight and I'm finally done. I have been very careful unpacking and inventorying, probably why it has taken 3+7 hours to get it done.
Hours used so far, a pretty good estimate:
10 hours: Planning, dreaming, checking finances and finally deciding
20 hours: Paperwork, ordering kit & tools, asking about taxes, having my shop audited
30 hours: Shop, cleaning and rearranging the garage, building benches, putting up shelves
10 hours: Unpacking & inventory. Everything put in marked boxes
total as of 2014-03-01 70 hours!
Spent about an hour yesterday and some hours tonight and I'm finally done. I have been very careful unpacking and inventorying, probably why it has taken 3+7 hours to get it done.
Hours used so far, a pretty good estimate:
10 hours: Planning, dreaming, checking finances and finally deciding
20 hours: Paperwork, ordering kit & tools, asking about taxes, having my shop audited
30 hours: Shop, cleaning and rearranging the garage, building benches, putting up shelves
10 hours: Unpacking & inventory. Everything put in marked boxes
total as of 2014-03-01 70 hours!