The building of a Vans RV-14
8/16/17
Pedals riveted
23 Rivets per pedal :) Except for the pop rivets, all was done with the pneumatic squeezer. Before riveting there was deburring before and after match drilling.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment