Section 31 wa done in only 6.4 hours, total. Mainly due to the pre made fuel lines that had a perfect fit. Section 32 is about the luggage area, it starts with trimming delrin blocks to be used for the flap actuation.
Return of the proseal stuff and the tool i "made" to be able to reach all the fuel fittings.
No comments:
Post a Comment