Something warmer to sit on |
All presqueezed about ten rivets apart |
before squeezing |
semi squeezed |
Turned the dies in the elevator edge special tool the other way and the angle was good |
final squeezed |
second flap prepared for riveting the trailing edge |
No comments:
Post a Comment