10/11/15

Started on the aileron leading edges

The leading edges are now together with clecos in preparation for match drilling the counterbalance tubes. A have a lot of respect for flutter so I would not dream about departing from the plan but it sure feels weird putting all that heavy weight into the aircraft.









No comments:

Post a Comment