The building of a Vans RV-14
8/1/15
One leading edge clecoed to the main spar
Started with riveting the lightning attach brackets. Then I filled the two pre drilled holes for a stall warner with small head rivets and finally I drilled the holes for the tie down rings before putting the right leading edge on the main spar.
A movie of me removing a bad rivet:
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment