The building of a Vans RV-14
7/10/15
Match drilling
Match drilled the most forward holes in the leading edge ribs and the J-stiffener for the right wing. Set up for doing the left wing in the next session.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment