The building of a Vans RV-14
11/17/14
Horizontal spar, tail, elevator
Things are coming together.
Match drilled the horizontal spar to the tail, installed the left elevator to the spar. When putting in the bearings I was smart and measured and screwed in the nut before installing the bearing into the elevator.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment