7/16/14

Preparing elevator parts

Almost time for priming. Lots of countersinking, dimpling, deburring, edge rolling and scuffing. Cleaned the parts with a solvent, the large parts inside and then the smaller parts outside in the fresh air.









No comments:

Post a Comment