5/23/16

3.4 hour of proseal work

To tired to care about pictures tonight. All end ribs are in place.

5/15/16

Another proseal session

Top stiffener, fuel cap, drain and lover inner rib. All on both tanks. Some rivets could be done with the squeezer :)


5/9/16

Amazing weather, lots of flying and no building

For good reasons I have had a break in my build. For instance: I have flown four days in a row, that is not common :D